CJW CONSTRUCTION, INC.
  • ABOUT
    • ABOUT CJW
    • CLIENTS
    • AWARDS
  • SERVICES
    • DREDGING AND MARINE
    • FACILITIES
    • HEAVY CIVIL CONSTRUCTION
    • UTILITIES
    • FEDERAL EMERGENCY
  • PROJECTS
  • ESTIMATING
  • CONTACT US
    • CAREERS

REPLACE THE WATERLINE ALONG COAST ROAD AND OCEAN AVENUE

Vandenberg Air Force Base, CA-US Army Corps of Engineers          

CJW was awarded this project at Vandenberg AFB, CA, to install 20,150 LF water mainline. The pipeline replaced a portion of the South Base potable waterline. Additional work included: removing and abandoning in-place existing waterline; clearing, grubbing, and excavation; trenching and shoring; jack and bore; blow-off valves and air vacs; water meters; gate valves and valve boxes; installation of fire hydrants; and the installation of pipe (requiring us to jack and bore through protected wetlands, as well as under active railroad tracks) and anchors and soil stabilizer; and relocation of pressure release valves.
 


CJW CONSTRUCTION, INC.
License # 803675

​CA​ • AZ• WA
Main Office Tel: 714-835-6820 Fax: 714-835-6821
Picture
© 2019 CJW Construction Inc. All rights reserved.
  • ABOUT
    • ABOUT CJW
    • CLIENTS
    • AWARDS
  • SERVICES
    • DREDGING AND MARINE
    • FACILITIES
    • HEAVY CIVIL CONSTRUCTION
    • UTILITIES
    • FEDERAL EMERGENCY
  • PROJECTS
  • ESTIMATING
  • CONTACT US
    • CAREERS