REPLACE THE WATERLINE ALONG COAST ROAD AND OCEAN AVENUE
Vandenberg Air Force Base, CA-US Army Corps of Engineers
CJW was awarded this project at Vandenberg AFB, CA, to install 20,150 LF water mainline. The pipeline replaced a portion of the South Base potable waterline. Additional work included: removing and abandoning in-place existing waterline; clearing, grubbing, and excavation; trenching and shoring; jack and bore; blow-off valves and air vacs; water meters; gate valves and valve boxes; installation of fire hydrants; and the installation of pipe (requiring us to jack and bore through protected wetlands, as well as under active railroad tracks) and anchors and soil stabilizer; and relocation of pressure release valves.
|
|