REMODEL B703 FOR OFFICES, 2ND FLOOR, COLUMNS 5-9, SOFIA ENG & TECHS AT NASA'S DRYDEN
AIRCRAFT FACILITY
NASA's Dryden Aircraft Facility-Palmdale, CA
CJW successfully remodeled the second floor of Building 703, Site 9, at Air Force Plant 42 for NASA. This project consisted of building 300 feet of a fire corridor, six offices, a conference room and a large project room to house 22 engineers. All new electrical, fixtures, fire alarms, an HVAC system, acoustical tile ceiling, and tile floor were installed.
|
|