lower santa ana river channel REACH 9 green river Mobile Home PARK
Orange County, CA
This project consisted of excavation and backfill of nearly 300,000 CY for the construction of grouted stone revetment of approximately 1,000 feet.
CJW also constructed an approximately 5,000 ft long temporary bike trail detour and bridge supports, and provided golf course irrigation system modifications as well as an access driveway for the golf course. Additional work included extending side drains, construction of v-gutter, hydro-seeding, abandonment of existing wells and construction of 150 utility protection retaining walls. A 1,500 LF waterline was relocated including the blow-off assemblies and fire hydrant. The existing waterline was abandoned, along with the adjacent appurtenances. |
|