IMPERIAL DAM DREDGING AND RECHARGE POND REHABILITATION LAGUNA SETTLING BASIN
Yuma, AZ
CJW Construction, Inc. performed the maintenance dredging along the overflow weir from the headworks of the All American Canal and north along the Colorado River channel for a distance of approximately 3,000 feet, approximately 2,100 feet along the face of the dam and weir, and approximately 1,200 feet north up the secondary river channel above the Gila Sluiceway adjacent to Hidden Shores (formerly Imperial Oasis) on the Arizona side of the river channel. CJW dredged over 2,000,000 CY of sediment from the Colorado River near Yuma, AZ.
|
|