Sierra Vista, AZ- US Army Corps of Engineers
This project consisted of two (2) major components. The first was the transfer of wastewater from Huachuca City's existing plant to the waste water treatment plant located at the Fort. The construction included 7 miles of PVC force main and Electrical conduit, as well as three wet-well type duplex submersible pump stations with back up emergency generators.
The second major component of the Effluent Re-Use Project is the construction of Equalization Basins and Pretreatment Facilities at the site of the Fort Huachuca Waste Water Treatment Plant. The basins have been constructed to contain a total volume of 3.0 million gallons. |
|