CMAR FOR LOWER SANTA ANA RIVER SAND MANAGEMENT
Project Description Goes Here
This project consisted of the removal of debris and sediment in the Lower Santa Ana River. CJW Construction disposed of over 480,000 CY of material that had accumulated within the lower earthen soft-bottom reaches of the Santa Ana River, from the Ocean Outlet to approximately 3.5 miles upstream, to just north of Adams Avenue.
|
|